|
|
| |
|
|
|
|
|
|
| Residential Flat / Apartment in Noida |
|
|
|
|
|
|
Specifications - Universal
|
Structure
|
|
RCC framed earthquake resistant structure
|
|
Wall finish
|
Internal Domestic Help Room External Lift Lobbies
|
Acylic emulsion celings in oil bound distemper Oil bound distemper Combination of stone, tiles and textured paint finish Marble / granite / vitnifed cladding and acrylic emulsion
|
|
Flooring
|
Living/Dining/master Bedroom Other Bed Rooms Domestics Help Room Kitchen Toilet Balconies & Terrace Lift Lobbies
|
Marble Laminated wooden flooring Ceramic tiles Ceamic tiles / marble Ceamic tiles / marble Ceamic tiles Granite / marble / vitrified tiles
|
|
Kitchen
|
Dado Fitings
|
Creamic tiles till 600 mm abovle counter area, rest painted with acrylic emulsion Granite counter with stainless steel sink and board
|
|
Doors
|
Main Entrance Internal
|
Seasoned hardwood framed frame with European style moulded shutter Seasoned hardwood framed frame with European style moulded shutter
|
|
Toilets
|
Dado Fittings
|
Select creamic tiles upto celling Granite counter, white sanitary fixtures, single lever CP fittings, pipe lines for geysers, bath tub in master bath, shower area in other toilets
|
|
Windows / External Doors
|
Powder coated / anodised aluminum glazing
|
|
Electrical
|
Copper electrical wiring in conceated conduits with provision for light points, and modular switches
|
|
Power Back-up
|
100%
|
|
Communication
|
TV and telephone points, video door phone
|
|
Lobby
|
Air-conditioned with designer furniture in the waiting area
|
Specifications - Bare Shell
|
Structure
|
|
RCC framed earthquake resistant structure
|
|
Wall finish
|
Internal Domestic Help Room External Lift Lobbies
|
Unpinted plastered walls Unpainted plastered walls Combination of stone, tiles and textured paint finish Marble / granited / vitnified cladding and acrylic emulsion
|
|
Flooring
|
Living/Dining/master Bedroom Other Bed Rooms Domestics Help Room Kitchen Toilet Balconies & Terrace Lift Lobbies
|
RCC slab without floor finish RCC slab without floor finish RCC slab without floor finish RCC slab without floor finish, with base filling and waterproofing RCC slab without floor finish, with base filling and waterproofing RCC slab without floor finish Granite / marble / vitrified
|
|
Kitchen
|
Dado Fitings
|
Unpainted plaster walls Plumbing piping without fixtures
|
|
Doors
|
Main Entrance Internal
|
Seasoned hardwood frame with European style moulded shutter Seasoned hardwood frame with no shutter
|
|
Toilets
|
Dado Fittings
|
Unpainted plastered walls Plumbing piping without fixtures
|
|
Windows / External Doors
|
Powder coated / anodised aluminum glazing
|
|
Electrical
|
Electrical wiring till the MDB, no internal wiring in the apartment. Concealed conduits and boxes exept switch plates
|
|
Power Back-up
|
100%
|
|
Communication
|
Conduits for TV and telephone points, vido door phone
|
|
Lobby
|
Air-conditioned with designer furniture in the waiting area
|
|
| |
| Contact Address: |
A-257 Shivalik, Panchsheel Geetanjali Road, New Delhi - 110 017 (INDIA) |
| Phone No: |
+91-011-40585858
|
| Mobile No.: |
+91-981-883-7873 |
| Email: |
info@meraapnaghar.com |
|
|
|
Club House |
|
Golf Course |
|
Gymnasium |
|
Kids Play Area |
|
Lift |
|
Park |
|
Power Back Up |
|
Private Terrace Garden |
|
Rain Water Harvesting |
|
Reserved Parking |
|
Security |
|
Servent Quarter |
|
Swimming Pool |
|
Vastu Compliant |
|
Water Storage |
| |
|
|
Basic Consideration Price for Universal Specification
|
:
|
Rs. 5245/- per sq. ft.
|
|
Basic Consideration Price for Barshell Specification
|
:
|
Rs. 4745/- per sq. ft.
|
|
Preferential location Charges (PLC) for Two to a Core Unit
|
:
|
Rs. 250/- per sq. ft.
|
|
Preferential location Charges (PLC) for Edge Unit
|
:
|
Rs. 250/- per sq. ft.
|
|
Preferential location Charges (PLC) for Tail Unit
|
:
|
Rs. 250/- per sq. ft.
|
|
Preferential location Charges (PLC) for Level 1
|
:
|
Rs. 300/- per sq. ft.
|
|
Preferential location Charges (PLC) for Level 2
|
:
|
Rs. 200/- per sq. ft.
|
|
Preferential location Charges (PLC) for Level 3
|
:
|
Rs. 150/- per sq. ft.
|
|
Preferential location Charges (PLC) for Level 4
|
:
|
Rs. 100/- per sq. ft.
|
|
Car parking Charges
|
:
|
Rs. 3,50,000 per below ground car parking
|
|
Terrace area
|
:
|
50% of BCP
|
|
Sinking Fund Deposit
|
:
|
Rs. 125/ per sq. ft.
|
Apart from BCP and PLC following amount is payable by the allotee at per square feet of the super area of the apartment :
|
1.
|
Lease rent of Plot (Proportionate Share)
|
:
|
Rs. 132/- per sq. ft.
|
|
2.
|
Electric Sub Station Charges Other Charges (If any)
|
:
|
Rs. 45/- per sq. ft.
|
In addition, Charges on account of external electrification work as demanded by the concerned competent autority, are payable extra.
Two under-ground car parking along with the apartment would be compulsory.
- Company would pay charges @ Rs. 10/- per sq. ft. of the super area per month for any delay attributable to the inability of the company subject to Force Majeure on handing over the apartment beyond the committed period of 30 months from the date of signing of the terms and condition of allotment.
- Similary the allotee(s) would be ilable to pay holding charges @ Rs. 10/- per sq. ft. of Super Area per month if the allotee(s) fails to take possession within 30 days from the date of issuance of the notice of the possession.
- Maintenance Charges for the period of 5 years to be determined at the time of offer of possession on the basis of super area of apartment + Service Tax and any other levies as applicable from time to time shall be payable extra.
Note : The above prices / payment plans are subject to revision / withdrawl at any time without notice and at the sole discretion of the company. Enrolment of Grande Club with the apartment would be compulsory.
Down Payment Plan - 'A'
|
At the time of Registration
|
:
|
10% of BCP + 10% of Sinking Fund Deposit
|
|
Within 45 Days of Registration / Allotment
|
:
|
85% of BCP + Lease Rent + PLC + Parking + 10% of Sinking Fund Deposit
|
|
On Final Notice of Possession
|
:
|
5% of BCP + 80% Sinking fund Deposit + Sub-lease deed charges & other charges as applicable.
|
Construction Linked Installment Plan - 'B'
|
|
|
For T-01 to T-04
|
For T-05 to T-07
|
|
At the time of registration
|
:
|
10% of BCP
|
10% of BCP
|
|
With in 3 months of Registration
|
:
|
15% of BCP + 100% PLC
|
15% of BCP + 100% PLC
|
|
With in 3 months of Registration
|
:
|
15% of BCP + 100% Parking Charges
|
15% of BCP + 100% Parking Charges
|
|
On Completion of Level 2 Roof #
|
:
|
5% of BCP + 100% Lease Rent
|
7.5% of BCP + 100% Lease Rent
|
|
On Completion of Level 5 Roof
|
:
|
5% of BCP + 20% of Sinking Fund
|
7.5% of BCP + 20% of Sinking Fund
|
|
On Completion of Level 8 Roof
|
:
|
5% of BCP
|
7.5% of BCP
|
|
On Completion of Level 11 Roof
|
:
|
5% of BCP
|
7.5% of BCP
|
|
On Completion of Level 14 Roof
|
:
|
5% of BCP
|
5% of BCP
|
|
On Completion of Level 17 Roof
|
:
|
5% of BCP
|
5% of BCP
|
|
On Completion of Level 20 Roof
|
|
5% of BCP
|
-
|
|
On Completion of Level 23 Roof
|
:
|
5% of BCP
|
-
|
|
On Casting of Top Floor Roof
|
:
|
5% of BCP
|
5% of BCP
|
|
On Completion of masony work within apartment
|
:
|
5% of BCP
|
5% of BCP
|
|
On Completion of internal Plaster within apartment
|
:
|
5% of BCP
|
5% of BCP
|
|
|
|
| Type |
Size |
INR |
Floor Plans |
|
| 3 BR - 3BT - 0SQ - 0PH |
2258 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2372 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2625 (sq. ft.) |
|
View Plan |
| 3 BR - 3BT - 0SQ - 0PH |
2372 (sq. ft.) |
|
View Plan |
| 3 BR - 3BT - 0SQ - 0PH |
2230 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2488 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2810 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2557 (sq. ft.) |
|
View Plan |
| 3 BR - 5BT - 0SQ - 0PH |
2557 (sq. ft.) |
|
View Plan |
| 3 BR - 4BT - 0SQ - 0PH |
2516 (sq. ft.) |
|
View Plan |
| 4 BR - 5BT - 0SQ - 0PH |
3272 (sq. ft.) |
|
View Plan |
| 4 BR - 5BT - 0SQ - 0PH |
3473 (sq. ft.) |
|
View Plan |
| 4 BR - 5BT - 0SQ - 0PH |
3799 (sq. ft.) |
|
View Plan |
| 4 BR - 5BT - 0SQ - 0PH |
3473 (sq. ft.) |
|
View Plan |
|
|
|
|
|
|
|
|
|